# Wood & Cedar Decks

Part of: New Deck Construction (https://www.osnovaconstruction.com/services/new-deck-construction)

Natural wood decks in pressure-treated pine, cedar and hardwoods across DuPage and Kane counties: stainless fasteners, sealed end cuts, frost footings, and honest advice on the staining cycle. Free on-site estimate.

## What it covers
- Pressure-treated pine, cedar, hardwoods
- Stainless or coated fasteners
- Sealed end cuts and flashed ledger
- Lowest first cost of any deck

## Why us
- Real wood look and feel
- Easiest deck to modify later
- Stain any color you like
- Same frost footings as composite

## How it goes
1. Consultation and species choice
2. Drawing and itemized proposal
3. Permit and footings
4. Frame, decking, railing
5. Seal or stain after the wood dries

There is still nothing that looks or feels quite like a real wood deck, and it remains the lowest first cost of any deck we build. Osnova Construction builds pressure-treated, cedar and hardwood decks across Glendale Heights, Wheaton, Elmhurst, St. Charles and the rest of the western suburbs, and we build them so the first winter does not undo the work.

The free consultation includes cedar and pressure-treated samples side by side, a drawing and an itemized price, and if you want the composite number on the same footprint we bring that too. [Request a free estimate](#contact).

The honest caveat comes first: a wood deck in northern Illinois needs staining every two to three years, and the boards that take the sun will need replacing before the frame does. Clients who know that and choose wood anyway are rarely disappointed. Clients who wanted a no-maintenance deck should read the [composite page](/services/composite-decks) before deciding.

## Species we build with

- **Pressure-treated pine**: the workhorse. Every deck frame we build is pressure-treated, and as decking it is the budget choice that still lasts 15 years with care.
- **Western red cedar**: naturally rot-resistant, light, stable, and the wood most people picture when they say "wood deck". Takes stain beautifully.
- **Hardwoods** (ipe, mahogany, cumaru): dense enough to sink in water, nearly impossible to scratch, and the longest-lived wood decking there is. Priced accordingly and needs oiling to keep its color.

## Building wood so it lasts here

Wood fails at the cuts and the connections, so that is where the attention goes. Every end cut gets sealed before it goes in. Fasteners are stainless or a coated screw rated for treated lumber, never bright nails that rust-streak the boards within a season. The ledger against the house is flashed and bolted through. Joist tops get a strip of flashing tape so water that runs between the boards does not sit on the frame. And the footings, as with every deck we build, go below the 42-inch frost line.

## Railing and stairs

A wood deck usually gets a wood railing, and we build it with the balusters spaced to code and the posts bolted to the frame rather than surface-mounted. If you want the wood look underfoot with a railing you never paint, black aluminum pairs well with cedar. See [railings installation](/services/railings-installation).

## Timeline

Wood goes down faster than composite: a typical deck is on site about a week to ten days after the permit clears. Staining comes later, once the lumber has dried, and we will tell you when.

Old wood deck past saving? That is a [deck replacement](/services/deck-replacement). Boards fine but the frame worries you? Start with [deck repair &amp; remodeling](/services/deck-repair).

## Why a wood deck from Osnova outlasts the one it replaces

- **Sealed cuts, stainless fasteners, flashed ledger, taped joists**: the four details that decide whether a wood deck lasts eight years or twenty.
- **Frost footings at 42 inches**, inspected, like every deck we build.
- **Licensed, insured, written workmanship warranty.**
- **A staining schedule in writing** at handover, so the deck gets the first coat at the right time.

Want a price on cedar next to composite for the same footprint? [Request a free estimate](#contact). Or [Send us a photo](#contact) of the yard and we will reply with a first take on species and layout.

## Frequently asked questions
**What decking materials do you build with?**
Composite (TimberTech, Trex, Fiberon), PVC (capped polymer), and natural wood (pressure-treated, cedar, hardwoods). We'll walk you through the trade-offs honestly - the most expensive option isn't always the right one for your home.

**Do I need a permit?**
Yes, in virtually every jurisdiction here. We pull the permits and handle inspections as part of every project, so you don't have to.

**How often does a wood deck need staining in Illinois?**
Every two to three years for a horizontal surface that takes sun, snow and foot traffic; railings and skirting go longer. Skip it twice and the top boards gray, check and start to cup. That upkeep, not the first price, is the real difference between wood and composite.

**Cedar or pressure-treated: what is the difference?**
Pressure-treated pine is the least expensive, resists rot chemically, and is what nearly every deck frame is made of. Cedar resists rot naturally, weighs less, does not splinter as readily and looks better, at about twice the board cost. Many of our wood decks use pressure-treated framing with cedar decking and railing.

**When should I stain a brand-new deck?**
Not right away. Pressure-treated lumber arrives wet and needs a few weeks to a couple of months to dry before it takes stain; a drop of water should soak in rather than bead. Cedar can be sealed sooner. We tell you the window when we hand over the deck.

**Is a wood deck cheaper than composite?**
On the day it is built, yes, by a clear margin. Over ten years the staining and the earlier board replacement close most of the gap. If you enjoy the maintenance or plan to sell within a few years, wood is a sound choice; if you never want to think about it again, composite is.

## Completed projects in
- Hanover Park (https://www.osnovaconstruction.com/services/wood-decks/in/hanover-park-il)

## Also serving
- Algonquin (https://www.osnovaconstruction.com/service-areas/algonquin-il)
- Aurora (https://www.osnovaconstruction.com/service-areas/aurora-il)
- Barrington (https://www.osnovaconstruction.com/service-areas/barrington-il)
- Barrington Hills (https://www.osnovaconstruction.com/service-areas/barrington-hills-il)
- Bartlett (https://www.osnovaconstruction.com/service-areas/bartlett-il)
- Batavia (https://www.osnovaconstruction.com/service-areas/batavia-il)
- Bloomingdale (https://www.osnovaconstruction.com/service-areas/bloomingdale-il)
- Burlington (https://www.osnovaconstruction.com/service-areas/burlington-il)
- Campton Hills (https://www.osnovaconstruction.com/service-areas/campton-hills-il)
- Carol Stream (https://www.osnovaconstruction.com/service-areas/carol-stream-il)
- Carpentersville (https://www.osnovaconstruction.com/service-areas/carpentersville-il)
- East Dundee (https://www.osnovaconstruction.com/service-areas/east-dundee-il)
- Elburn (https://www.osnovaconstruction.com/service-areas/elburn-il)
- Elgin (https://www.osnovaconstruction.com/service-areas/elgin-il)
- Elmhurst (https://www.osnovaconstruction.com/service-areas/elmhurst-il)
- Geneva (https://www.osnovaconstruction.com/service-areas/geneva-il)
- Gilberts (https://www.osnovaconstruction.com/service-areas/gilberts-il)
- Glen Ellyn (https://www.osnovaconstruction.com/service-areas/glen-ellyn-il)
- Glendale Heights (https://www.osnovaconstruction.com/service-areas/glendale-heights-il)
- Hampshire (https://www.osnovaconstruction.com/service-areas/hampshire-il)
- Hoffman Estates (https://www.osnovaconstruction.com/service-areas/hoffman-estates-il)
- Huntley (https://www.osnovaconstruction.com/service-areas/huntley-il)
- Lily Lake (https://www.osnovaconstruction.com/service-areas/lily-lake-il)
- North Aurora (https://www.osnovaconstruction.com/service-areas/north-aurora-il)
- Pingree Grove (https://www.osnovaconstruction.com/service-areas/pingree-grove-il)
- Roselle (https://www.osnovaconstruction.com/service-areas/roselle-il)
- Saint Charles (https://www.osnovaconstruction.com/service-areas/saint-charles-il)
- Schaumburg (https://www.osnovaconstruction.com/service-areas/schaumburg-il)
- Sleepy Hollow (https://www.osnovaconstruction.com/service-areas/sleepy-hollow-il)
- South Elgin (https://www.osnovaconstruction.com/service-areas/south-elgin-il)
- Streamwood (https://www.osnovaconstruction.com/service-areas/streamwood-il)
- Trout Valley (https://www.osnovaconstruction.com/service-areas/trout-valley-il)
- Virgil (https://www.osnovaconstruction.com/service-areas/virgil-il)
- Warrenville (https://www.osnovaconstruction.com/service-areas/warrenville-il)
- Wayne (https://www.osnovaconstruction.com/service-areas/wayne-il)
- West Chicago (https://www.osnovaconstruction.com/service-areas/west-chicago-il)
- West Dundee (https://www.osnovaconstruction.com/service-areas/west-dundee-il)
- Wheaton (https://www.osnovaconstruction.com/service-areas/wheaton-il)
- Winfield (https://www.osnovaconstruction.com/service-areas/winfield-il)

Page: https://www.osnovaconstruction.com/services/wood-decks
Provider: Osnova Construction (https://www.osnovaconstruction.com)